Part 6: Hardware equipment level inspection and operation and maintenance of the battery system on the energy storage side of the photovoltaic power station

Part 6: Hardware equipment level inspection and operation and maintenance SOP of the battery system on the energy storage side of the photovoltaic power station

This article corresponds to the panoramic topology diagram of the energy storage power station [Module 6: Battery System Hardware], covering personal protection (PPE) and gas pre-inspection when entering the high-voltage area of ​​the battery compartment, high-voltage box (BDU) main contactor and pre-charge circuit, manual maintenance switch (MSD), high-voltage connection copper bar fastening and anti-corrosion temperature measurement, battery Pack module, cold plate quick-change connector and single cell physical structure inspection.

1. Safety protection pre-inspection and personal protective equipment (PPE) specifications before entering the cabin

High-voltage direct current of up to 1000V ~ 1500V is concentrated inside the battery compartment, which carries the risk of high-voltage electric shock and arc burns. The "three inspections, one wearing and one monitoring" pre-inspection procedure must be strictly implemented:

(1) Forced ventilation and gas safety testing when entering the cabin

Explosion-proof forced ventilation: Before opening the door, press the strong exhaust button outside the cabin to forcibly start the explosion-proof exhaust fan in the cabin for ventilation for no less than 5 minutes.

Gas detection standards: Use a calibrated portable four-in-one gas detector to probe into the cabin at three different heights for sampling tests:

Carbon monoxide (CO): must be 0 ppm (> 24 ppm indicates that the internal separator of the battery cell has smoldering and depolymerized);

Hydrogen (H2): must be 0 ppm (> 100 ppm indicates serious overcharging of the battery cell with hydrogen evolution);

Lower explosion limit of flammable gas (LEL): must be < 1% LEL; oxygen concentration (O2): must be ≥ 19.5% (anti-suffocation).

(2) Human body static electricity elimination and PPE protection specifications

Static elimination: Before entering the cabin, touch the "human body static discharge ball" next to the cabin door with your palm for no less than 3 seconds.

PPE wearing standards: Operation and maintenance personnel must wear anti-static cotton overalls, non-slip insulating shoes (withstand voltage ≥ 10kV), 1000V/1500V-level insulating gloves and arc-proof masks.

On-site air entrainment test of insulating gloves: before wearing, roll the glove sleeve toward the fingertips and observe that the glove expands without bubbles, air leakage, or pinhole damage.

Double supervision mechanism: It is strictly prohibited for one person to enter the battery compartment alone to work! It must be operated by one person and supervised by one person. The guardian holds a portable high-voltage cut-off switch and an emergency rescue insulating hook.

2. High voltage box (BDU/BCU) equipment level maintenance and testing

The high-voltage box (BDU - Battery Disconnect Unit) is the high-voltage master control center of each battery cluster, integrating the main contactor, precharge circuit, high-voltage main fuse and MSD.

(1) DC main contactor adhesion test and contact resistance temperature measurement

Contact sticking (contact welding) diagnosis SOP: After the BMS issues the opening command, use a multimeter to measure the impedance between the incoming and outgoing terminals of the main positive contactor (Main+) and the main negative contactor (Main-).

Standard: Impedance in disconnected state must be > 100 MΩ. If the impedance is close to 0 Ω, it is determined as a contact adhesion failure. The contactor cannot cut off the high voltage due to arc welding. The power must be stopped immediately and the contactor must be replaced.

Contact voltage drop and contact resistance test: With the contactor in the closed state, use a microohmmeter to apply a 10A DC current to measure the main contact resistance, which must be ≤ 0.5 mΩ. If the resistance is too high, the contactor will heat up violently during charging and discharging.

(2) Precharge circuit parameter verification and response time

Precharge resistor maintenance: Check that the ceramic shell of high-power precharge resistor (such as 50 Ω / 100 W) has no cracks, desoldering or blackening. The measured resistor impedance must be within ± 5% of the nominal value.

Precharge control logic verification: After the precharge contactor is closed, the precharge current charges the PCS bus capacitor. The precharge time must be controlled between 100 ~ 300 ms; when the bus voltage reaches ≥ 95% of the cluster voltage, the main contactor can be closed, and then the precharge contactor is disconnected. If the precharge time is > 1000ms, the BMS must report "precharge timeout" and force a trip.

(3) Inspection and maintenance of high-voltage main fuse and MSD manual maintenance switch

High-voltage main fuse (Master Fuse): Check that the 1500V DC / 315A~400A master fuse collision indicator does not pop out. The impedance measured at both ends of the fuse must be < 0.1 mΩ.

Manual maintenance switch (MSD - Manual Service Disconnect):

Function: Pull out the MSD during maintenance to physically cut the 1000V ~ 1500V high-voltage battery cluster into two safe voltage segments lower than 750V.

Check: Check that the high-voltage interlock (HVIL) control pins inside the MSD are not bent or broken. Test the MSD plug-in and pull-out torque smoothly, and the contact resistance must be ≤ 1.0 mΩ.

3. Battery cluster (Cluster) and high-voltage busbar connection maintenance SOP

The battery cluster is composed of multiple battery packs connected in series on a stand. The high-voltage busbar in the cluster carries the total current of the entire cluster.

(1) Standard comparison table for tightening torque of high-voltage copper row bolts

Operation and maintenance personnel must use an insulated torque wrench that has been measured and calibrated to conduct random inspections of all high-voltage copper bars and pole bolts in the battery cluster (the inspection rate is not less than 20%), and redraw the anti-loosening marking lines:

(2) Infrared thermal imaging temperature measurement and anti-oxidation treatment SOP

Temperature measurement standard: When the battery cluster is charged and discharged at a constant current of 0.5C for 30 minutes, use an infrared thermal imager to scan all copper bars and pole bolts.

The operating temperature of bolts and copper bar nodes must be < 60.0 ℃; the temperature difference of all connection nodes in the same battery cluster must be ΔT ≤ 5.0 ℃. Exception handling SOP: If the temperature of a certain pole connection point is > 70.0 ℃ or the temperature difference with the adjacent node is ≥ 15.0 ℃, it is determined that the contact resistance is too large and the heat is generated:

Step 1: Disconnect the main circuit breaker of the battery cluster and pull out the MSD to perform electrical testing and grounding.

Step 2: Remove the connecting bolts and copper bars at the heating pole.

Step 3: Use 1000-grit fine sandpaper to lightly polish the contact surface between the pole and the copper bar to remove the patina and black oxide layer.

Step 4: Use isopropyl alcohol wipes to wipe away the debris, and evenly apply a thin layer of anti-oxidation conductive paste (thickness 0.1 ~ 0.2 mm).

Step 5: Reinstall the copper bar, use a torque wrench to tighten the bolts according to the standard torque (M8: 18~20 N·m), and re-tie the anti-loosening wire.

4. Battery Pack module and single cell physical structure maintenance

(1) 280Ah / 314Ah hard-shell LFP battery core deformation and explosion-proof valve detection

Cell swelling and thickness control: Use a vernier caliper to measure the thickness of the cell center point. The initial thickness of the new 280Ah/314Ah LFP cells is approximately 71.5 ± 0.5 mm.

Control line: When cyclic aging causes the expansion thickness of the battery core to increase > 5% (i.e. thickness increase > 3.5 mm) or the pack module end plate deformation > 3.0 mm, it means that the internal stress of the battery core is too high, and it is necessary to apply for decommissioning and replacement.

Explosion-proof valve (pressure relief valve) status inspection: Check the aluminum explosion-proof film on the top of the battery core. The explosion-proof membrane must be flat without bulges or cracks.

Judgment: If white or yellow-brown crystal particles (electrolyte evaporation residue) appear around the explosion-proof membrane, it means that the battery core has experienced micro-jet or leakage, and the battery core is judged to be a seriously dangerous product and must be immediately isolated and scrapped.

(2) Inspection of the quick-change joint of the liquid-cooled cold plate inside the Pack

Check the self-sealing liquid cooling quick coupler (Quick Coupler) at the water inlet and outlet of each Pack.

Maintenance: The quick-change joint must be free of any traces of blue or red antifreeze crystals. Use a water mark test paper close to the joint gap to confirm that there is no trace leakage; check that the airgel insulation pad between the cells inside the Pack does not absorb water, swell and deteriorate.

Photovoltaic power station energy storage side battery system hardware equipment level on-site inspection sign-in form

Power station name: _______________________________ Inspection date: ____ month ____ day, 2026

Inspection area: high-pressure area inside the battery compartment (cluster 01~08) Inspection person in charge: ____________________

1. Field equipment inspection and test data records:

2. Inspection defect registration and defect elimination dispatch:

3. Inspection sign-in and review signature:

Inspection engineer (signature): _______________ Supervision engineer (signature): _______________

Review (signature) of the shift leader: _______________ Sign-in and filing time: ____ hour on ____ month ____ day 2026

第6篇:光伏电站储能侧电池系统硬件设备级巡检与运维

第6篇:光伏电站储能侧电池系统硬件设备级巡检与运维 SOP

本篇对应储能电站全景拓扑图【模块六:电池系统硬件】,涵盖进入电池舱高压区的个人防护(PPE)与气体预检、高压箱(BDU)主接触器与预充回路、手动维护开关(MSD)、高压连接铜排紧固与防腐测温、电池 Pack 模组、冷板快换接头以及单体电芯物理结构检修。

一、 进舱前安全防护预检与个人防护装备 (PPE) 规范

电池舱内部集中了高达 1000V ~ 1500V 的高压直流电,具有高压触电与电弧灼伤风险,必须严格执行“三检一穿一监护”预检程序:

(一)进舱强迫通风与气体安全检测

防爆强迫换气:开门前,按下舱外强排风按钮,强行启动舱内防爆排风机换气不少于 5 分钟。

气体检测标准:使用经过标定的便携式四合一气体检测仪探入舱内上中下三个不同高度采样测试:

一氧化碳(CO):须为 0 ppm(> 24 ppm 预示电芯内部隔膜已发生阴燃解聚);

氢气(H2):须为 0 ppm(> 100 ppm 预示电芯严重过充析氢);

可燃气体爆炸下限(LEL):须 < 1% LEL;氧气浓度(O2):须 ≥ 19.5%(防窒息)。

(二)人体静电消除与 PPE 防护规范

静电消除:进舱前,手掌触摸舱门旁边的“人体静电释放球”不少于 3 秒。

PPE 穿戴标准:运维人员必须穿戴防静电棉质工作服、防滑绝缘鞋(耐压 ≥ 10kV)、佩戴 1000V/1500V 级绝缘手套及防电弧面罩。

绝缘手套现场卷气测试:穿戴前将手套套口向指尖卷挤,观察手套膨胀无气泡漏气、无针孔破损。

双人监护机制:严禁单人独入电池舱作业!必须一人操作、一人监护,监护人手持便携式高压切断闸及应急救援绝缘钩。

二、 高压箱 (BDU / BCU) 设备级检修与测试

高压箱(BDU - Battery Disconnect Unit)是每个电池簇的高压总控中枢,集成了主接触器、预充回路、高压主熔断器及 MSD。

(一)直流主接触器粘连测试与触点电阻测温

触点粘连(触点焊接)诊断 SOP:在 BMS 下发分闸指令后,使用万用表测量主正接触器(Main+)及主负接触器(Main-)进线与出线端之间的阻抗。

标准:断开状态下阻抗须 > 100 MΩ。若阻抗接近 0 Ω,判定为触点粘连故障,接触器因电弧熔焊无法切断高压,必须立即停止上电,更换接触器。

触点压降与接触电阻测试:在接触器吸合状态下,使用微欧计施加 10A 直流电流测量主触点电阻,须 ≤ 0.5 mΩ。若电阻偏大,充放电时接触器会剧烈发热。

(二)预充回路参数校验与响应时间

预充电阻检修:检查陶瓷外壳大功率预充电阻(如 50 Ω / 100 W)外壳无开裂、无脱焊发黑。测量电阻阻抗须在标称值 ± 5% 范围内。

预充控制逻辑校验:预充接触器吸合后,预充电流给 PCS 母线电容充电。预充时间须控制在 100 ~ 300 ms;当母线电压达到簇电压的 ≥ 95% 时,主接触器方可吸合,随后预充接触器断开。若预充时间 > 1000ms,BMS 须报“预充超时”并强行跳闸。

(三)高压主熔断器与 MSD 手动维护开关检修

高压主熔断器(Master Fuse):检查 1500V DC / 315A~400A 主熔断器碰撞指示器无弹出。测量熔断器两端阻抗须 < 0.1 mΩ。

手动维护开关(MSD - Manual Service Disconnect):

作用:在检修时拔出 MSD,从物理上将 1000V ~ 1500V 的高压电池簇切断为两段低于 750V 的安全电压段。

检查:检查 MSD 内部的高压互锁(HVIL)控制针脚无弯曲折断。测试 MSD 插拔力矩顺畅,触点接触电阻须 ≤ 1.0 mΩ。

三、 电池簇(Cluster)与高压母排连接维保 SOP

电池簇由多个电池 Pack 在立架上串联组合而成,簇内高压母排承载着全簇的总电流。

(一)高压铜排螺栓紧固力矩标准对照表

运维人员须使用经过计量校验的绝缘扭力扳手,对电池簇内所有高压铜排与极柱螺栓进行抽检(抽检率不低于 20%),并重新画打防松标记线:

(二)红外热成像测温与防氧化处理 SOP

测温标准:电池簇在 0.5C 恒流充放电 30 分钟时,用红外热像仪扫描所有铜排与极柱螺栓。

螺栓及铜排节点运行温度须 < 60.0 ℃;同一电池簇内所有连接节点的温差须 ΔT ≤ 5.0 ℃。异常处理 SOP:若某一极柱连接点温度 > 70.0 ℃ 或与相邻节点温差 ≥ 15.0 ℃,判定为接触电阻过大发热:

第1步:断开电池簇总断路器并拉出 MSD,进行验电与接地。

第2步:拆下发热极柱处的连接螺栓与铜排。

第3步:用 1000 目细砂纸轻轻打磨极柱与铜排接触面,去除铜绿与黑色氧化层。

第4步:用异丙醇湿巾擦净残屑,均匀涂抹一层薄薄的防氧化导电膏(厚度 0.1 ~ 0.2 mm)。

第5步:重新安装铜排,用扭力扳手按标准力矩(M8: 18~20 N·m)紧固螺栓,重新打防松线。

四、 电池 Pack 模组与单体电芯物理结构维保

(一)280Ah / 314Ah 硬壳 LFP 电芯形变与防爆阀检测

电芯溶胀与厚度控制:使用游标卡尺测量电芯中心点厚度。新 280Ah/314Ah LFP 电芯初始厚度约为 71.5 ± 0.5 mm。

控制线:当循环老化导致电芯膨胀厚度增加 > 5%(即厚度增加 > 3.5 mm)或 Pack 模组端板变形量 > 3.0 mm 时,说明电芯内部应力过高,必须申请退役更换。

防爆阀(泄压阀)状态检视:检查电芯顶部的铝制防爆膜。防爆膜必须平整无鼓包、无破裂。

判定:若防爆膜周围出现白色、黄褐色结晶颗粒(电解液蒸发残留物),说明电芯发生过微喷气或渗液,该电芯判定为严重危险品,须立即隔离报废。

(二)Pack 内部液冷冷板快换接头检修

检查每一个 Pack 进出水接口处的自封式液冷快换接头(Quick Coupler)。

检修:快换接头须无任何青蓝色或红色防冻液结晶痕迹。使用水痕试纸贴近接头缝隙,确认无微量滴漏;检查 Pack 内部电芯之间的气凝胶隔热垫无吸水膨胀变质。

光伏电站储能侧电池系统硬件设备级现场巡检签到表

电站名称:_______________________________ 巡检日期:2026 年 ____ 月 ____ 日

巡检区域:电池舱内部高压区 (簇01~08 ) 巡检负责人:____________________

一、现场设备巡检与测试实测数据记录:

二、 巡检缺陷登记与消缺派工:

三、 巡检签到与复核签字:

巡检工程师(签字):_______________ 监护工程师(签字):_______________

值班长复核(签字):_______________ 签到归档时间:2026 年 ____ 月 ____ 日 ____ 时