Part 4: Equipment-level inspection and operation and maintenance of the thermal management and temperature control system on the energy storage side of the photovoltaic power station

Part 4: Equipment-level inspection and operation and maintenance SOP of the thermal management and temperature control system on the energy storage side of the photovoltaic power station

This article corresponds to the panoramic topology diagram of the energy storage power station [Module 4: Thermal Management and Temperature Control System], covering the peripheral mechanical protection of the battery compartment, door anti-condensation and slight positive pressure, liquid cooling source unit (Chiller), expansion tank, coolant water quality analysis and replacement SOP, and air-cooled air-conditioning system.

1. SOP for battery compartment peripheral mechanical protection, sealing to prevent condensation and micro-positive pressure system maintenance

The battery compartment is usually an explosion-proof structure of a 20-foot or 40-foot standard container, and the protection level must reach IP54 / IP65.

(1) Hatch door mechanical seal and anti-condensation control

Inspection of hatch sealing: Check the EPDM rubber sealing strips on all sides of the battery hatch. It is required that there is no hardening, cracking, peeling or powdering; the hatch is closed and buckled tightly, and there is no gap for light transmission. Check the three-point anti-theft lock and hinge, and add anti-rust grease. Check that the rainproof eaves and drainage channels are not damaged or blocked.

Anti-condensation and micro-positive pressure system maintenance:

Anti-condensation control: When the relative humidity in the cabin is ≥ 70% RH, the anti-condensation heater in the cabin must start automatically. Check that there is no accumulation of debris on the surface of the heater and no burning smell.

Slightly positive pressure control: A battery cabin equipped with a fresh air system must maintain a slightly positive pressure of 10 ~ 30 Pa in the cabin to prevent the intrusion of sand, dust and high-humidity air outside the cabin.

(2) Maintenance SOP for Explosive Vent Panel

The explosion relief device is the ultimate safety barrier for physical and directional pressure relief when the battery undergoes thermal runaway and produces a large amount of flammable gas, resulting in overpressure in the cabin.

Pre-tightening force inspection: Check the explosion vent panel and breakable bolts on the top of the container. The tightening torque of the bolts must be strictly controlled at 10.0 ± 1.0 N·m (too tight will cause the explosion to fail when overpressure occurs, and too loose will cause the seal to fail).

Safety distance: It is strictly prohibited to lay any cables, bridges or pile debris within 3 meters above the explosion vent and in the direction of the injection; there should be no obstruction by the explosion-proof bird net.

Explosion vent sensor: Check the extreme position travel switch attached to the explosion vent panel. When testing the action of the travel switch, SCADA must receive a "cabin explosion alarm" within <1s.

2. Equipment-level inspection and maintenance SOP for thermal management liquid cold source unit (Chiller unit)

The liquid cooling thermal management system circulates coolant (ethylene glycol aqueous solution) in the cold plate of the battery pack to control the battery core temperature at 20 ℃ ~ 30 ℃. The maximum temperature difference of the battery cells in the entire cabin is ≤ 3.0 ℃.

(1) Maintenance of circulating water pump and expansion tank

Circulating water pump operation inspection: Check the three-phase operating current balance of the water pump (deviation < 2%); use a sound level meter to measure the water pump bearing noise, which must be < 65 dB.

Check the water pump inlet and outlet pressure gauges. The pressure difference between inlet and outlet ΔP = Pout - Pin must be stable between 0.15 ~ 0.30 MPa. If the pressure difference is < 0.08 MPa, it means that the water pump is corroded or the pipeline is seriously blocked; if the pressure difference is > 0.40 MPa, it means that the pipeline is seriously blocked. The water pump mechanical seal has no leakage or water leakage.

Expansion Tank (Expansion Tank) precharge pressure verification: The expansion tank is used to absorb the volume changes of the coolant's thermal expansion and contraction and to suppress water hammer.

Verification SOP: When the water pump stops running and the pipeline is depressurized, use a pressure gauge to measure the nitrogen pressure at the valve at the top of the expansion tank. The standard pre-charge pressure must be 0.10 ~ 0.15 MPa. If liquid spurts out when the valve is pressed, the internal rubber diaphragm is ruptured and the expansion tank must be replaced.

(2) Maintenance of condenser and compressor

Cleaning of condenser fins: Use dry compressed air or high-pressure water gun (pressure < 0.3 MPa) every quarter to flush the dust accumulated on the aluminum fins of the condenser to ensure the cooling air volume.

Compressor refrigerant pressure detection: Check the high-pressure side pressure (usually 1.5 ~ 2.2 MPa) and low-pressure side pressure (usually 0.3 ~ 0.5 MPa, taking R410A / R134a refrigerant as an example) of the refrigeration compressor. There are no continuous air bubbles in the sight glass and no traces of refrigerant leakage.

(3) Three-way electronic regulating valve and PTC liquid heater

Three-way electronic control valve action proportion verification: The three-way valve automatically adjusts the proportion of coolant flowing through the refrigeration evaporator or bypass pipeline according to the inlet and outlet water temperature. Check the response of the stepper motor, there must be no jamming during the switching of opening 0% ➔ 100%, and the opening feedback error is < 2%.

PTC liquid heater maintenance (low temperature environment): When the ambient temperature is <5°C and the battery is in a low temperature state, the PTC heater starts to heat the coolant. Use a 1000V megger to measure the insulation resistance of the PTC heating tube to ground, which must be ≥ 100 MΩ; measure the balance of the PTC three-phase resistance to ensure that the low-temperature heating function is normal.

3. Coolant water quality analysis, Y-type filter cleaning, fluid replenishment and exhaust SOP

Coolant is the "blood" of the liquid cooling system. Deterioration of water quality will cause corrosion and scaling of the liquid cooling plate or cause the breakdown of the battery's high-voltage insulation to ground.

(1) Coolant key water quality testing standard table

(2) SOP for the entire process of Y-type filter cleaning and pipeline replenishment and exhaust

Step 1: Stop the water pump of the liquid cooling unit, cut off the main power supply, and close the main water inlet and outlet valve of the liquid cooling unit.

Step 2: Connect the hose to the low drain valve, drain about 5L of coolant, and reduce the pipeline pressure to 0 MPa.

Step 3: Use a wrench to unscrew the nut at the bottom of the Y-type filter and take out the 100-mesh stainless steel filter.

Step 4: Rinse the scale, impurities and metal shavings trapped in the filter with clean water, blow dry with compressed air, replace the fluororubber (FKM) sealing ring and install it back.

Step 5: Connect the electric filling pump to the liquid filling port and inject the original premixed glycol coolant until the expansion tank level reaches 2/3 of the mark.

Step 6: Start the water pump to circulate at low speed for 10 minutes, and open the exhaust valve at the highest point of the battery compartment to exhaust.

Step 7: When the exhaust valve no longer sprays bubbles and the pressure gauge stabilizes at 0.18 ~ 0.22 MPa, tighten the exhaust valve and complete the fluid replenishment and exhaust.

4. Equipment-level maintenance of cabinet air-cooled air-conditioning system (air-cooled power station/auxiliary air-cooled)

Evaporator/condenser and fan: Check the running current balance of the internal and external circulation fans, and there is no abnormal noise; clean the evaporator dust filter.

Drainage and condensate water catchment pan: Check that the condensate water drainage hose is unobstructed and that there is no accumulation of water in the water catchment pan that could cause algae to become clogged.

Refrigerant leakage inspection: Use an electronic leak detector to detect the copper pipe welding joints to ensure that there is no leakage of pressure difference and refrigerant.

Photovoltaic power station energy storage side thermal management temperature control system equipment level inspection on-site inspection sign-in form

Power station name: _______________________________ Inspection date: ____ month ____ day, 2026

Inspection area: periphery of battery compartment and liquid cooling unit (Chiller) area Inspection person in charge: ____________________

1. Field equipment inspection and test data records:

2. Inspection defect registration and defect elimination dispatch:

3. Inspection sign-in and review signature:

Inspection engineer (signature): _______________ Supervision engineer (signature): _______________

Review (signature) of the shift leader: _______________ Sign-in and filing time: ____ hour on ____ month ____ day 2026

第4篇:光伏电站储能侧热管理温控系统设备级巡检与运维

第4篇:光伏电站储能侧热管理温控系统设备级巡检与运维 SOP

本篇对应储能电站全景拓扑图【模块四:热管理温控系统】,涵盖电池舱外围机械防护、舱门防凝露与微正压、液冷源机组(Chiller)、膨胀罐、冷却液水质分析与更换 SOP,以及风冷空调系统。

一、 电池舱外围机械防护、密封防凝露与微正压系统维保 SOP

电池舱通常为 20 尺或 40 尺标准集装箱防爆结构,防护等级须达到 IP54 / IP65。

(一)舱门机械密封与防凝露控制

舱门密封性检视:检查电池舱门四周三元乙丙(EPDM)橡胶密封胶条,要求无硬化开裂、无脱落粉化;舱门关闭扣压紧密,无缝隙透光。检查三点式防盗锁具及铰链,加注防锈润滑脂。检查防雨檐与排水槽无破损堵塞。

防凝露与微正压系统维保:

防凝露控制:当舱内相对湿度 ≥ 70% RH 时,舱内防凝露加热器必须自动启动。检查加热器表面无堆积杂物,无发焦异味。

微正压控制:配有新风系统的电池舱,舱内须维持 10 ~ 30 Pa 的微正压,防止舱外沙尘及高湿空气倒灌。

(二)舱顶机械泄爆阀(Explosive Vent Panel)检修 SOP

泄爆装置是在电池发生热失控产生大量可燃气体导致舱内超压时,进行物理定向泄压的最终安全屏障。

预紧力检查:检查集装箱顶部的泄爆面板及易断螺栓。螺栓紧固力矩须严格控制在 10.0 ± 1.0 N·m(过紧会导致超压时不泄爆,过松会导致密封失效)。

安全距离:泄爆口上方及喷射方向 3 米范围内,严禁敷设任何电缆、桥架或堆放杂物;泄爆防鸟网无阻塞。

泄爆传感器:检查泄爆面板附带的极限位置行程开关,测试行程开关动作时,SCADA 须在 < 1s 内收到“舱体泄爆告警”。

二、 热管理液冷源机组(Chiller 机组)设备级检修与保养 SOP

液冷热管理系统通过冷却液(乙二醇水溶液)在电池 Pack 冷板内的循环,将电芯温度控制在 20 ℃ ~ 30 ℃,全舱电芯最大温差 ≤ 3.0 ℃。

(一)循环水泵与膨胀罐维保

循环水泵运行检测:检查水泵三相运行电流平衡(偏差 < 2%);用声级计测量水泵轴承噪音,须 < 65 dB。

检查水泵进出口压力表。进出口压差 ΔP = P出 - P进 须稳定在 0.15 ~ 0.30 MPa 之间。若压差 < 0.08 MPa,说明水泵气蚀或管路严重气堵;若压差 > 0.40 MPa,说明管路严重堵塞。水泵机械密封无滴漏渗水。

膨胀罐(Expansion Tank)预充压力校验:膨胀罐用于吸收冷却液热胀冷缩的体积变化并平抑水锤。

校验 SOP:在水泵停止运行且管路泄压状态下,使用气压表测量膨胀罐顶部气门嘴的氮气压力。标准预充气压须为 0.10 ~ 0.15 MPa。若按下气门嘴有液体喷出,说明内部橡胶隔膜破裂,必须更换膨胀罐。

(二)冷凝器与压缩机维保

冷凝器翅片清理:每季度使用干式压缩空气或高压水枪(压力 < 0.3 MPa)冲洗冷凝器铝翅片上的飞絮积灰,保证散热风量。

压缩机冷媒压力检测:检查制冷压缩机运行高压侧压力(通常为 1.5 ~ 2.2 MPa)与低压侧压力(通常为 0.3 ~ 0.5 MPa,以 R410A / R134a 冷媒为例)。视液镜内无连续气泡,无冷媒泄漏痕迹。

(三)三通电子调节阀与 PTC 液体加热器

三通电子调节阀动作比例校验:三通阀根据进出水温度,自动调节冷却液流经制冷蒸发器或旁路管路的比例。检查步进电机响应,切换开度 0% ➔ 100% 过程须无卡阻,开度反馈误差 < 2%。

PTC 液体加热器维保(低温环境):当环境温度 < 5 ℃ 且电池处于低温状态时,PTC 加热器启动对冷却液加热。使用 1000V 摇表测量 PTC 加热管对地绝缘电阻,须 ≥ 100 MΩ;测量 PTC 三相电阻平衡度,确保低温加热功能正常。

三、 冷却液水质分析、Y 型过滤器清洗与补液排气 SOP

冷却液是液冷系统的“血液”,水质恶化会导致液冷板腐蚀、结垢或引发电池高压对地绝缘击穿。

(一)冷却液关键水质检测标准表

(二)Y 型过滤器清洗与管路补液排气全流程 SOP

第1步:停运液冷机组水泵,切断主电源,关闭液冷机组进出水总阀门。

第2步:在低位排液阀处接软管,放掉约 5L 冷却液,降低管路压力至 0 MPa。

第3步:用扳手拧开 Y 型过滤器底部螺帽,取出 100 目不锈钢滤网。

第4步:用清水冲洗滤网截留的水垢、杂质与金属屑,用压缩空气吹干,更换氟橡胶(FKM)密封圈后装回。

第5步:将电动加注泵连接至加液口,注入原厂预混型乙二醇冷却液,直至膨胀罐液位达 2/3 刻度。

第6步:启动水泵低速循环 10 分钟,打开电池舱最高点排气阀进行排气。

第7步:当排气阀不再喷出气泡、压力表稳定在 0.18 ~ 0.22 MPa 时,拧紧排气阀,补液排气完成。

四、 柜式风冷空调系统(风冷电站/辅助风冷)设备级维保

蒸发器/冷凝器及风机:检查内外循环风机运行电流平衡,无异响;清洗蒸发器防尘滤网。

排水与冷凝水接水盘:检查冷凝水排水软管通畅,接水盘无积水滋生藻类堵塞。

制冷剂泄漏排查:使用电子检漏仪检测铜管焊接头,确保压差与冷媒无渗漏。

光伏电站储能侧热管理温控系统设备级巡检现场巡检签到表

电站名称:_______________________________ 巡检日期:2026 年 ____ 月 ____ 日

巡检区域:电池舱外围与液冷机组 (Chiller) 区 巡检负责人:____________________

一、现场设备巡检与测试实测数据记录:

二、 巡检缺陷登记与消缺派工:

三、 巡检签到与复核签字:

巡检工程师(签字):_______________ 监护工程师(签字):_______________

值班长复核(签字):_______________ 签到归档时间:2026 年 ____ 月 ____ 日 ____ 时