Part 3: Equipment-level inspection and operation and maintenance of photovoltaic power station energy storage side converter (PCS) system

Part 3: Photovoltaic power station energy storage side converter (PCS) system equipment level inspection and operation and maintenance SOP

This article corresponds to the panoramic topology diagram of the energy storage power station [Module 3: Energy Storage Converter PCS System], covering the PCS cabin dustproof ventilation, AC and DC incoming switches, IGBT power modules, DC support capacitors, filter inductors and secondary control and protection logic.

1. PCS converter cabin appearance, dustproof ventilation and AC/DC inlet channels

(1) Cabin environment and protection level inspection

Cabin temperature and humidity control: Check the cabin temperature and humidity sensor. The ambient temperature inside the cabin must be controlled between 0 ℃ ~ 40 ℃; the relative humidity must be < 70% RH. The anti-condensation heater must start automatically when the humidity is ≥ 75% RH.

Hatch sealing: Check the EPDM sealing tape of the container door to see if there is any cracking or falling off, and there is no gap to let light through when closed.

(2) Dust filter cleaning and waterless purging SOP

Disassembly and cleaning of the dust filter: Remove the primary filter cotton from the air inlet, clean it with an industrial vacuum cleaner or rinse it with neutral detergent, and put it back after it is completely dried (moisture content 0%).

SOP for waterless purging in the cabin (annual power outage and overhaul): Apply for power outage for power inspection and connect the ground wire. Use a compressed air pump with a high-efficiency water removal filter (the air pressure is strictly controlled at 0.20 ~ 0.30 MPa), equipped with an insulated nozzle hose, and blow the gaps between the circuit board and the radiator in a "top to bottom" order.

It is strictly prohibited to use a wet cloth with water or an air gun that has not removed water to clean the circuit board.

(3) AC and DC incoming circuit breakers and fast fuses

DC side circuit breaker (DC Breaker): Disassemble the arc extinguishing cover and check that the grid plate has no ablation and deformation; the magnetic blowing coil is well insulated and has no burning smell.

aR-class semiconductor rapid fuse: Check that the red striker does not pop out, and use a microohmmeter to measure the contact resistance at both ends of the fuse, which must be ≤ 0.1 mΩ. If the resistance increases, it means that the internal melt has been partially ablated and must be replaced.

AC side circuit breaker (AC Breaker): Check the energy storage time of the electric energy storage mechanism < 10s; measure the three-phase closing asymmetry must be < 1.0 ms.

Infrared temperature measurement and tightening torque standards:

After running at full power for 30 minutes, use an infrared thermal imaging camera to scan the AC/DC circuit breaker terminals. The operating temperature must be < 65 ℃, and the temperature difference between phases/poles ΔT ≤ 5.0 ℃. If the temperature of the terminal block is > 75 ℃ or the temperature difference ΔT ≥ 15 ℃, the power must be cut off to disassemble the copper bar, polish the oxide layer and apply 0.1 mm anti-oxidation conductive paste, and then tighten the bolts according to the following table:

2. PCS core inverter unit and power module (IGBT) operation and maintenance

(1) IGBT module and thermal grease overcoating SOP

IGBT junction temperature monitoring: the junction temperature at full load operation must be < 85 ℃; when the junction temperature reaches 95 ℃, the power will be automatically derated by 50%; when the junction temperature reaches 105 ℃, an over-temperature trip will be triggered. Check that the driver board triggering fiber is not bent or blocked, and that the driver board indicator light is normal.

Thermal grease recoating SOP (performed every 3 years or when the junction temperature rises > 10°C from the initial level):

Step 1: Cut off the power, check the power, and use a special discharge rod to release the residual charge of the DC bus (make sure the DC bus voltage is < 10V).

Step 2: Remove the IGBT module and completely wipe off the old silicone grease from the base plate with isopropyl alcohol and a lint-free cloth.

Step 3: Use a scraper or screen printing to evenly apply a layer of new thermal conductive silicone grease (thermal conductivity > 3.0 W/m·K, thickness controlled at 50 ~ 100 μm).

Step 4: Reinstall the module, tighten the bolts twice in a diagonal cross sequence (torque: 3.0 ~ 5.0 N·m), and rewire and receive power.

(2) DC bus support capacitor (DC-Link) maintenance

Appearance inspection: There are no bulges in the capacitor shell, no leakage, and no explosion-proof valve rupture.

Capacity and ESR test: After full discharge after a power outage, use an LCR meter to measure the capacitance capacity. When the capacity attenuates > 10% from the nominal value or the equivalent series resistance (ESR) increases > 50% from the initial value, the entire capacitor must be replaced.

Bus voltage ripple coefficient: Under full power discharge, the actual measured DC bus voltage ripple coefficient using an oscilloscope (AC coupling mode) must be < 1.0%.

(3) Maintenance of filter inductor and LC filter

Insulation and temperature rise: Use a 1000V megger to measure the insulation resistance of the inductor winding to ground must be ≥ 100 MΩ; the operating temperature must be < 90 ℃.

Noise check: Under full load charging and discharging, the measured noise at a distance of 1 meter from the cabinet must be < 75 dB. If there are abnormal high-frequency magnetic shock noises, the iron core bolts must be retightened (M12 torque: 70 N·m).

3. Secondary control loop, sampling board, phase locking and grid adaptive protection logic

(1) Sampling accuracy and zero point calibration

Sampling accuracy: Use a power quality analyzer to measure the actual voltage/current and compare it with the monitoring screen. The voltage sampling error must be ≤ ± 0.5%, and the current sampling error must be ≤ ± 0.5%.

Zero point calibration: If the monitor displays a small current in the standby state (current 0 A), "zero offset automatic calibration" must be performed in the control background.

(2) Measured SOP of phase-locked loop (PLL) and anti-islanding (Anti-Islanding)

Phase-locked loop tracking: When the grid-side frequency fluctuates between 45.0 ~ 55.0 Hz, the phase-locked loop must accurately lock the phase within < 20 ms, with a tracking error of < 1°.

Measured SOP for anti-islanding protection: When the large power grid loses power, the PCS must automatically disconnect the grid-connected switch and stop inversion within ≤ 2.0s.

Actual measurement steps: In the grid-connected discharge (50% power) state, manually open the grid-side analog circuit breaker. Oscilloscope monitoring shows that the PCS must cut off the AC current output and report a grid-side power loss alarm within < 200 ms.

(3) Low/high voltage ride through (LVRT/HVRT) and wind turbine maintenance

Voltage ride-through: When the grid-side voltage drops to 20% of the rated voltage, the PCS must ensure that it does not go off-grid within 0.625s and inject dynamic reactive current; when the voltage rises to 130%, it must ensure that it does not go off-grid for 0.50s.

Fan array: Check the air pressure switch function. When a fan fails and stops spinning, the PCS must report a fan failure within <3 seconds and derate the power by 30%. Fans must be replaced in groups after 20,000 operating hours.

Photovoltaic power station energy storage side PCS converter container cabin/converter cabinet area on-site inspection sign-in form

Power station name: _______________________________ Inspection date: ____ month ____ day, 2026

Inspection area: PCS converter container cabin/converter cabinet area Inspection person in charge: ____________________

1. On-site equipment inspection and testing actual data records:

2. Inspection defect registration and defect elimination dispatch:

3. Inspection sign-in and review signature:

Inspection engineer (signature): _______________ Supervision engineer (signature): _______________

Review (signature) of the shift leader: _______________ Sign-in and filing time: ____ hour on ____ month ____ day 2026

第3篇:光伏电站储能侧变流器(PCS)系统设备级巡检与运维

第3篇:光伏电站储能侧变流器(PCS)系统设备级巡检与运维 SOP

本篇对应储能电站全景拓扑图【模块三:储能变流器 PCS 系统】,涵盖 PCS 舱体防尘通风、交直流进线开关、IGBT 功率模组、直流支撑电容、滤波电感及二次控制与保护逻辑。

一、 PCS 变流舱外观、防尘通风与交直流进线通道

(一)舱体环境与防护等级检查

舱体温湿度控制:检查舱内温湿度传感器。舱内环境温度须控制在 0 ℃ ~ 40 ℃ 之间;相对湿度须 < 70% RH。当湿度 ≥ 75% RH 时,防凝露加热器必须自动启动。

舱门密封:检查集装箱舱门三元乙丙(EPDM)密封胶条,无开裂脱落,关闭时无缝隙透光。

(二)防尘滤网清理与无水吹扫 SOP

防尘网拆洗:拆下进风口初效过滤棉,使用工业吸尘器清理或中性洗涤剂冲洗,必须完全晾干(含水率 0%)后装回。

舱内无水吹扫 SOP(每年停电大修执行):申请停电验电并挂接地线。使用带高效除水滤清器的压缩空气泵(气压严格控制在 0.20 ~ 0.30 MPa),配绝缘喷嘴软管,按“自上而下”顺序吹扫电路板与散热器缝隙。

严禁使用带水湿布或未除水的风枪吹扫电路板。

(三)交直流进线断路器与快速熔断器

直流侧断路器(DC Breaker):拆开灭弧罩,检查栅片无烧蚀变形;磁吹线圈绝缘良好,无发焦气味。

aR 级半导体快速熔断器:检查红色撞针无弹出,用微欧计测量熔断器两端接触电阻须 ≤ 0.1 mΩ。若电阻增大,说明内部熔体已局部烧蚀,须更换。

交流侧断路器(AC Breaker):检查电动储能机构储能时间 < 10s;测量三相合闸不同期性须 < 1.0 ms。

红外测温与紧固力矩标准:

满功率充放电运行 30 分钟后,使用红外热像仪扫描 AC/DC 断路器接线端子,运行温度须 < 65 ℃,相间/极间温差 ΔT ≤ 5.0 ℃。若接线端子温度 > 75 ℃ 或温差 ΔT ≥ 15 ℃,须停电拆开铜排,打磨氧化层并涂抹 0.1 mm 防氧化导电膏后,按下表紧固螺栓:

二、 PCS 核心逆变单元与功率模组(IGBT)运维

(一)IGBT 模组与导热硅脂复涂 SOP

IGBT 结温监控:满载运行结温须 < 85 ℃;结温达 95 ℃ 时自动降额 50% 功率;达 105 ℃ 时触发过温跳闸。检查驱动板触发光纤无弯折卡阻,驱动板指示灯正常。

导热硅脂复涂 SOP(每3年或结温较初始升高 > 10 ℃ 时执行):

第1步:停电、验电并使用专用放电棒释放直流母线残余电荷(确保 DC 母线电压 < 10V)。

第2步:拆下 IGBT 模块,用异丙醇和无尘布彻底擦除底板旧硅脂。

第3步:用刮刀或丝网印刷均匀涂抹一层新导热硅脂(导热系数> 3.0 W/m·K厚度控制在50 ~ 100 μm)。

第4步:装回模块,按对角交叉顺序分二次紧固螺栓(扭矩:3.0 ~ 5.0 N·m),重新接线受电。

(二)直流母线支撑电容(DC-Link)维保

外观检查:电容外壳无鼓包、无漏液、无防爆阀破裂。

容量与 ESR 测试:停电充份放电后,使用 LCR 表测量电容容量。容量较标称值衰减 > 10% 或等效串联电阻(ESR)较初始值增加 > 50% 时,必须整组更换电容。

母线电压纹波系数:满功率放电下,使用示波器(AC 耦合档)实测直流母线电压纹波系数须 < 1.0%。

(三)滤波电感与 LC 滤波器检修

绝缘与温升:用 1000V 摇表测量电感绕组对地绝缘电阻须 ≥ 100 MΩ;运行温度须 < 90 ℃。

噪音检查:满负荷充放电下,距离柜体 1 米处实测噪音须 < 75 dB。若有异常高频磁震异响,须重新紧固铁芯螺栓(M12 扭矩:70 N·m)。

三、 二次控制回路、采样板、锁相与电网适应性保护逻辑

(一)采样精度与零点校准

采样精度:使用电能质量分析仪实测电压/电流,与监控屏比对,电压采样误差须 ≤ ± 0.5%,电流采样误差须 ≤ ± 0.5%。

零点校准:待机状态(电流 0 A)下若监控显示微小电流,须在控制后台执行“零点偏移自动校准”。

(二)锁相环(PLL)与防孤岛保护(Anti-Islanding)实测 SOP

锁相环跟踪:当网侧频率在 45.0 ~ 55.0 Hz 波动时,锁相环须在 < 20 ms 内精准锁定相位,跟踪误差 < 1°。

防孤岛保护实测 SOP:当大电网失电时,PCS 必须在 ≤ 2.0s 内自动断开并网开关并停止逆变。

实测步骤:在并网放电(50% 功率)状态下,手动断开网侧模拟断路器。示波器监测显示 PCS 须在 < 200 ms 内切断交流电流输出并报网侧失电告警。

(三)低/高电压穿越(LVRT/HVRT)与风机维保

电压穿越:网侧电压跌落至 20% 额定电压时,PCS 须保证 0.625s 内不脱网运行,并注入动态无功电流;电压升高至 130% 时,须保证 0.50s 不脱网。

风扇阵列:检查风压开关功能,某个风扇故障停转时,PCS 须在 < 3s 内报风机故障并降额 30% 功率。风扇运行达到 20,000 小时须成组更换。

光伏电站储能侧PCS变流集装箱舱 / 变流柜区现场巡检签到表

电站名称:_______________________________ 巡检日期:2026 年 ____ 月 ____ 日

巡检区域:PCS 变流集装箱舱 / 变流柜区 巡检负责人:____________________

一、 现场设备巡检与测试实测数据记录:

二、 巡检缺陷登记与消缺派工:

三、 巡检签到与复核签字:

巡检工程师(签字):_______________ 监护工程师(签字):_______________

值班长复核(签字):_______________ 签到归档时间:2026 年 ____ 月 ____ 日 ____ 时