Part 2: Equipment-level inspection and operation and maintenance of high-voltage transformation, distribution and boost system on the energy storage side of photovoltaic power stations

Part 2: Equipment-level inspection and operation and maintenance SOP of the high-voltage transformation, distribution and boost system on the energy storage side of the photovoltaic power station

This article corresponds to the panoramic topology diagram of the energy storage power station [Module 2: High-voltage transformation, distribution and boost system], covering 10kV/35kV high-voltage switch cabinet, step-up box-type transformer (box-type transformer), high-voltage busbar/cable head and station main grounding grid.

1. 10kV / 35kV high-voltage switchgear maintenance and inspection SOP

The high-voltage switch cabinet (SF6 ring main unit or central vacuum switch cabinet) is responsible for controlling and protecting the AC high-voltage main circuit of the entire station.

(1) SF6 air pressure and vacuum circuit breaker inspection

SF6 gas pressure gauge: Check the switchgear gas pressure gauge. The air pressure must be in the green qualified area (usually 0.35 ~ 0.45 MPa). If the pointer drops to the red zone (low voltage lockout), forced opening and closing operations are strictly prohibited!

Vacuum circuit breaker and spring energy storage: Check that the opening/closing position indicator light and mechanical indicator plate are correct; confirm that the spring energy storage status displays "Stored".

Contact synchronicity: During a power outage for maintenance, use a switching characteristic tester to measure the three-phase closing non-synchrony of the vacuum circuit breaker, which must be < 1.0 ms.

(2) Handcart position, mechanical five-proof locking and live display

Handcart position: Confirm that the circuit breaker handcart is in the "working position" or "test position" and the secondary overload plug is locked firmly.

Mechanical five-proof locking verification: Confirm that when the circuit breaker is in the closed state, the grounding knife switch and the cabinet door are mechanically locked and cannot be forcibly opened.

Charged indicator: The L1, L2, and L3 indicators of the high-voltage charged indicator light up normally and there is no missing phase.

2. Maintenance SOP for step-up box-type transformer (box-type transformer)

The box-type transformer steps up the low-voltage AC power (such as 690V) output by the PCS to 10kV or 35kV and integrates it into the grid. Divided into oil-immersed transformers and dry-type transformers.

(1) Inspection specifications for oil-immersed box-type transformers

Oil level gauge and oil color inspection: Observe the indication of the oil level gauge. The oil level must be between the scale lines corresponding to the ambient temperature (such as the 25°C scale line). The transformer oil must be transparent and light yellow in color. If the oil is black, dark or turbid, it means that partial discharge has occurred internally or the insulating oil has been carbonized, and a sample must be taken for oil dissolved gas analysis (DGA).

Respirator (moisture absorber) silica gel inspection: Check that there is oil in the sealing oil cup at the bottom of the moisture absorber, and the discolored silica gel particles in the tank are dark blue. If > 2/3 of the silica gel turns pink or white, it means that the silica gel is saturated with moisture and must be replaced with dry silica gel immediately.

Casing and leakage inspection: Check that the high and low voltage porcelain casings have no cracks or traces of discharge; there is no oil leakage in the box radiator and high-pressure valves.

(2) Inspection specifications for dry box-type transformers

Winding temperature control: Check the three-phase winding temperature of the temperature controller. Under natural air cooling, the winding temperature must be < 90 ℃; when the temperature ≥ 100 ℃, the forced air cooling fan starts automatically; when the temperature ≥ 130 ℃, an over-temperature alarm is triggered; when it reaches 150 ℃, a trip is triggered.

3. Maintenance of high-voltage busbars, cable heads and high-voltage lightning arresters (SPD)

(1) Infrared temperature measurement and partial discharge (PD) detection of high-voltage cable heads:

Infrared thermal imaging temperature measurement: When the power station is running at full power, infrared temperature measurement is performed on the intermediate head and terminal head of the 35kV cable. The temperature of bushings and terminal blocks must be < 70 ℃, and the temperature difference between phases ΔT ≤ 5.0 ℃.

Ultrasonic partial discharge (PD) detection: Use a portable partial discharge tester close to the high-voltage cable head and switch cabinet busbar. If the discharge pulse frequency is detected and increases significantly (partial discharge value > 20 pC) or obvious corona discharge sound is heard, it indicates that there is a defect in the internal insulation, and a power outage withstand voltage test needs to be arranged.

(2) Inspection of zinc oxide high-voltage arrester (SPD): Check that the porcelain sleeve/composite insulation sleeve of the arrester is not damaged and flashover: record the readings of the arrester leakage current meter and lightning action counter. Continuous leakage current values ​​should be within the normal range (typically < 1.0 mA). If the leakage current exceeds the standard, it means that the valve plate is old and damp, and must be replaced after a power outage.

4. Station main grounding grid and equipotential bonding test

Ground grid resistance test (annual):

Testing tool: Large ground resistance tester (different frequency method).

Standard: The power frequency grounding resistance of the main grounding network of the power station must be < 0.5 Ω. In areas with high soil resistivity (such as Gobi and mountainous areas), the maximum value shall not exceed 5.0 Ω, and an equipotential bonding network must be equipped.

Grounding overlap and corrosion inspection: Check the overlap of the flat steel (or copper cable) between the booster transformer casing, the base of the high-voltage cabinet, the arrester grounding terminal and the main grounding grid. Check for corrosion 0.5 meters underground on the grounded flat steel. If the cross-section corrosion rate is >30%, galvanized flat steel of the same specification must be repaired (double-sided welding, the welding length must be ≥ 2 times the width of the flat steel).

Photovoltaic power station energy storage side high-voltage transformation and distribution system on-site inspection sign-in form

Power station name: _______________________________ Inspection date: ____ month ____ day, 2026

Inspection area: high-voltage switch room and booster box area Inspection person in charge: ____________________

1. On-site equipment inspection and testing actual data records:

2. Inspection defect registration and defect elimination dispatch:

3. Inspection sign-in and review signature:

Inspection engineer (signature): _______________ Supervision engineer (signature): _______________

Review (signature) of the shift leader: _______________ Sign-in and filing time: ____ hour on ____ month ____ day 2026

第2篇:光伏电站储能侧高压变配电与升压系统设备级巡检与运维

第2篇:光伏电站储能侧高压变配电与升压系统设备级巡检与运维 SOP

本篇对应储能电站全景拓扑图【模块二:高压变配电与升压系统】,涵盖 10kV/35kV 高压开关柜、升压箱式变压器(箱变)、高压母排/电缆头及站用主接地网。

一、 10kV / 35kV 高压开关柜检修与巡检 SOP

高压开关柜(SF6 环网柜或中置式真空开关柜)负责控制和保护整站的交流高压主回路。

(一)SF6 气压与真空断路器检查

SF6 气体压力表:检查开关柜气体压力表。气压须处于绿色合格区域(通常为 0.35 ~ 0.45 MPa)。若指针降至红区(低压闭锁),严禁强行分合闸操作!

真空断路器与弹簧储能:检查分/合闸位置指示灯与机械指示牌正确;确认弹簧储能状态显示“已储能(Stored)”。

触点同步性:停电检修时,使用开关特性测试仪测量真空断路器三相合闸不同期性,须 < 1.0 ms。

(二)手车位置、机械五防闭锁与带电显示

手车位置:确认断路器手车处于“工作位置”或“试验位置”,二次重载插头锁定牢固。

机械五防闭锁校验:确认断路器在合闸状态时,接地刀闸与柜门被机械锁死,无法强制开启。

带电显示器:高压带电显示器 L1、L2、L3 指示灯发光正常,无缺相。

二、 升压箱式变压器(箱变)维保 SOP

箱变将 PCS 输出的低压交流电(如 690V)升压至 10kV 或 35kV 并入电网。分为油浸式变压器与干式变压器。

(一)油浸式箱变巡检规范

油位计与油色检查:观察油位计指示,油位须处于环境温度对应的刻度线之间(如 25 ℃ 刻度线)。变压器油色必须呈现透明淡黄色。若油色发黑发暗或浑浊,说明内部发生过局部放电或绝缘油碳化,须抽样做油溶解气体分析(DGA)。

呼吸器(吸湿器)硅胶检查:检查吸湿器底部的密封油杯有油,罐内变色硅胶颗粒呈深蓝色。若硅胶有 > 2/3 变为粉红色或白色,说明硅胶已吸湿饱和,必须立即更换干燥硅胶。

套管与渗漏排查:检查高低压瓷套管无裂纹、无放电痕迹;箱体散热片、高压阀门无渗油漏油。

(二)干式箱变巡检规范

绕组温度控制:检查温控仪三相绕组温度。自然风冷下,绕组温度须 < 90 ℃;当温度 ≥ 100 ℃ 时,强迫风冷风机自动启动;当温度 ≥ 130 ℃ 时,超温报警;达到 150 ℃ 时触发跳闸。

三、 高压母排、电缆头与高压避雷器(SPD)检修

(一)高压电缆头红外测温与局放(PD)检测:

红外热成像测温:在电站满功率运行状态下,对 35kV 电缆中间头及终端头进行红外测温。套管及接线端子,温度须 < 70 ℃,相间温差 ΔT ≤ 5.0 ℃。

超声波局部放电(PD)检测:使用便携式局放测试仪贴近高压电缆头与开关柜母线。若检测到放电脉冲频率,显著增加(局放值 > 20 pC)或听到明显电晕放电声,说明内部绝缘存在缺陷,需安排停电耐压试验。

(二)氧化锌高压避雷器(SPD)检查:检查避雷器瓷套/复合绝缘套无破损闪络:记录避雷器泄漏电流表及雷击动作计数器读数。持续泄漏电流值应处于正常范围(通常 < 1.0 mA)。若泄漏电流超标,说明阀片老化受潮,须停电更换。

四、 站用主接地网与等电位连接测试

接地网电阻测试(年度):

测试工具:大型接地电阻测试仪(异频法)。

标准:电站主接地网工频接地电阻须 < 0.5 Ω。在土壤电阻率较高地区(如戈壁、山区),最大不得超过 5.0 Ω,且必须配备等电位连接网。

接地搭接与腐蚀检修:检查升压变外壳、高压柜底座、避雷器接地端与主接地网的扁钢(或铜缆)搭接情况。检查接地扁钢地下 0.5 米处的腐蚀情况。若截面腐蚀率 > 30%,必须补焊同规格镀锌扁钢(双面焊接,焊接长度须 ≥ 2 倍扁钢宽度)。

光伏电站储能侧高压变配电系统现场巡检签到表

电站名称:_______________________________ 巡检日期:2026 年 ____ 月 ____ 日

巡检区域:高压开关室与升压箱变区 巡检负责人:____________________

一、 现场设备巡检与测试实测数据记录:

二、 巡检缺陷登记与消缺派工:

三、 巡检签到与复核签字:

巡检工程师(签字):_______________ 监护工程师(签字):_______________