Part 1: Equipment-level inspection and operation and maintenance SOP of auxiliary system for photovoltaic power station energy storage side station

Part 1: Equipment-level inspection and operation and maintenance SOP of auxiliary system for photovoltaic power station energy storage side station

This article corresponds to the panoramic topology diagram of the energy storage power station [Module 1: Station Auxiliary System], covering the station environment perimeter, station AC power distribution system, ATS dual power automatic switching, station DC panel/UPS uninterruptible power supply and station-level fire control main screen.

1. Station area perimeter, flood and explosion prevention and environmental safety inspection SOP

After the engineer enters the power station site, he first checks the physical safety boundaries and explosion-proof and flood-proof facilities of the entire station:

Inspection of security perimeter and flood control facilities: Check that the electronic fence and infrared intrusion alarm system are normal, and that the station area video surveillance cameras are not blocked and the lenses are not dusty. Confirm that the flood control drains in the station area are not blocked by debris, the flood control baffles (height ≥ 500 mm) under the base of the battery compartment and PCS cabin are installed in place, and there are sufficient reserves of flood control sandbags.

Inspection of the explosion-proof vent (Explosive Vent) of the battery compartment: Check the mechanical explosion-proof valve and explosion-proof membrane on the top of the container. There are no trees, cables or obstacles above the explosion vent and within 3 meters of the spray direction; the explosion-proof membrane has no rupture, corrosion or stuck.

2. Maintenance SOP for station auxiliary AC power distribution system

The station power system provides AC 380V/220V auxiliary power for the entire station’s air conditioners, liquid-cooled water pumps, BMS, lighting and fire protection.

(1) Inspection of station transformer and AC distribution cabinet:

Station transformer: Check the temperature controller reading of the dry-type station transformer (such as 35kV/0.4kV). The winding temperature must be < 80 ℃; the automatic start and stop function of the fan is normal.

Temperature measurement and tightening of AC power distribution cabinet: Use an infrared thermal imaging camera to scan the incoming and outgoing terminals of the main circuit breaker. The operating temperature must be < 60 ℃, and the three-phase temperature difference ΔT ≤ 5.0 ℃. During annual power outage maintenance, use a torque wrench to retighten the main busbar bolts of the distribution cabinet (M10 torque: 38 ~ 42 N·m).

(2) ATS dual power automatic transfer switch test SOP

Test cycle: Conduct a power cut test every six months.

测试步骤:

Step 1: Confirm that the station DC panel and UPS are supplying power normally to ensure that the relay protection does not lose power.

Step 2: Manually disconnect the main station power incoming line circuit breaker (simulating the main station power loss).

Step 3: Observe the ATS action: The ATS must automatically switch to the backup power supply side within < 100 ms, and the backup loop power supply indicator light turns on.

Step 4: Check that the liquid-cooled water pump, air conditioner and fire host are running smoothly and restart without tripping.

Step 5: Close the main station power circuit breaker, and the ATS will automatically switch back to the main power supply side after a delay of 5 seconds.

3. Station DC panel and UPS uninterruptible power supply maintenance SOP

The DC panel (DC 220V/110V) and UPS system are the "last life-saving power supply" for circuit breaker opening and closing and relay protection when the entire station loses power.

(1) DC panel lead-acid/gel battery pack inspection

Single cell float voltage detection: Use a digital multimeter to measure the single battery (12V nominal) float voltage. The qualified range is 13.50 V ~ 13.80 V (at 25 ℃ environment). If the cell voltage is < 13.20 V, it means the battery is undercharged or has an internal short circuit.

Battery internal resistance test: Use a battery internal resistance meter to measure. When the internal resistance of a single battery increases > 25% from the initial value, the single unit must be replaced.

Insulation monitoring: The DC panel insulation monitor shows that the insulation resistance of the positive/negative busbar to ground must be ≥ 0.2 MΩ (220V system).

(2) Inspection of UPS uninterruptible power supply system

Check the UPS control panel to confirm that it is in "Inverter Mode"; the actual output power is controlled between 30% ~ 70% of the rated capacity.

4. Station-level fire control main screen and explosion-proof linkage test

(1) Fire control main screen (FACP) inspection: Confirm that there are no "fire alarm", "fault" or "shielding" alarms on the main screen; the backup battery is in a fully charged floating charge state.

(2) Probe self-inspection and explosion-proof exhaust ventilation strong start test: Check that the carbon monoxide (CO), hydrogen (H2), and combustible gas (VOC) probe indicators flash normally.

Exhaust air forced start test: Press the "forced exhaust button" on the fire panel, the outdoor explosion-proof exhaust fan must start within < 2s, and the exhaust wind speed must be ≥ 8 m/s.

Photovoltaic power station energy storage side station auxiliary system on-site inspection and maintenance sign-in form

Power station name: _______________________________ Inspection date: ____ month ____ day, 2026

Inspection area: Station area perimeter, power distribution room and main control room Inspection person in charge: ____________________

1. On-site equipment inspection and test data recording

2. Inspection defect registration and defect elimination dispatch

3. Inspection sign-in and review signature:

Inspection engineer (signature): _______________ Supervision engineer (signature): _______________

Review (signature) of the shift leader: _______________ Sign-in and filing time: ____ hour on ____ month ____ day 2026

第1篇:光伏电站储能侧站用辅助系统设备级巡检与运维 SOP

第1篇:光伏电站储能侧站用辅助系统设备级巡检与运维 SOP

本篇对应储能电站全景拓扑图【模块一:站用辅助系统】,涵盖站区环境周界、站用 AC 配电系统、ATS 双电源自动切换、站用直流屏/UPS 不间断电源及站级消防控制主屏。

一、 站区周界、防汛防爆与环境安全巡检 SOP

工程师进入电站现场后,首先检查整站的物理安全边界与防爆防汛设施:

安防周界与防汛设施检查:检查电子围栏、红外对射入侵告警系统正常,站区视频监控摄像头无遮挡、镜头无积灰。确认站区防汛排水沟无杂物堵塞,电池舱及 PCS 舱基座下方的防汛挡水板(高度 ≥ 500 mm)安装到位,防汛沙袋储备充足。

电池舱防爆泄压口(Explosive Vent)检视:检查集装箱顶部的机械泄爆阀及防爆膜。泄爆口上方及喷射方向 3 米范围内无任何树木、线缆或障碍物;防爆膜无破裂、无锈蚀死卡。

二、 站用辅助 AC 配电系统维保 SOP

站用电系统为全站空调、液冷水泵、BMS、照明及消防提供交流 380V/220V 辅助电源。

(一)站用变压器与 AC 配电柜检查:

站用变压器:检查干式站用变(如 35kV/0.4kV)温控仪读数,绕组温度须 < 80 ℃;风机自动启停功能正常。

AC 配电柜测温与紧固:使用红外热像仪扫描主断路器进出线端子,运行温度须 < 60 ℃,三相温差 ΔT ≤ 5.0 ℃。每年停电检修时,用扭力扳手重紧配电柜主母排螺栓(M10 扭矩:38 ~ 42 N·m)。

(二)ATS 双电源自动切换开关测试 SOP

测试周期:每半年进行一次切电测试。

测试步骤:

第1步:确认站用直流屏与 UPS 正常供电,保障继电保护不掉电。

第2步:手动断开主站用电进线断路器(模拟主站用电失电)。

第3步:观察 ATS 动作:ATS 须在 < 100 ms 内自动切换至备用电源侧,备用回路供电指示灯亮起。

第4步:检查液冷水泵、空调及消防主机运行平稳,无跳闸重启。

第5步:合上主站用电断路器,ATS 延时 5 秒后自动切回主电源侧。

三、 站用直流屏与 UPS 不间断电源维保 SOP

直流屏(DC 220V/110V)与 UPS 系统是断路器分合闸及继电保护在全站失电时的“最后保命电源”。

(一)直流屏铅酸/胶体蓄电池组巡检

单体浮充电压检测:使用数字万用表测量单体蓄电池(12V 标称)浮充电压,合格范围为 13.50 V ~ 13.80 V(25 ℃ 环境下)。若单体电压 < 13.20 V,说明该电池欠充或内部短路。

电池内阻测试:使用蓄电池内阻仪测量。当单体蓄电池内阻较初始值增加 > 25% 时,必须更换该单体。

绝缘监测:直流屏绝缘监测仪显示正/负母线对地绝缘电阻须 ≥ 0.2 MΩ(220V 系统)。

(二)UPS 不间断电源系统巡检

检查 UPS 控制面板,确认处于“逆变供电状态(Inverter Mode)”;实际输出功率控制在额定容量的 30% ~ 70% 之间。

四、 站级消防控制主屏与防爆联动测试

(一)消防控制主屏(FACP)巡检:确认主屏无“火警”、“故障”或“屏蔽”告警;备用蓄电池处于满电浮充状态。

(二)探头自检与防爆排风强启测试:检查一氧化碳(CO)、氢气(H2)、可燃气体(VOC)探头指示灯闪烁正常。

排风强启测试:按下消防屏“强制排风按钮”,舱外防爆排风机须在 < 2s 内启动,排风风速须 ≥ 8 m/s。

光伏电站储能侧站用辅助系统现场巡检与维保签到表

电站名称:_______________________________ 巡检日期:2026 年 ____ 月 ____ 日

巡检区域:站区周界、配电房及主控室 巡检负责人:____________________

一、 现场设备巡检与测试实测数据记录

二、 巡检缺陷登记与消缺派工

三、 巡检签到与复核签字:

巡检工程师(签字):_______________ 监护工程师(签字):_______________

值班长复核(签字):_______________ 签到归档时间:2026 年 ____ 月 ____ 日 ____ 时