Part 4: Equipment-level inspection and operation and maintenance of PV side confluence and low-voltage distribution system of photovoltaic power station

Part 4: Equipment-level inspection and operation and maintenance SOP of PV side confluence and low-voltage distribution system of photovoltaic power station

This article corresponds to the panoramic topology diagram of the photovoltaic power station [Module 4: Convergence and Low-voltage Distribution System], which serves as the hub connecting the inverter and the boost box transformer/component array, covering string AC combiner box/AC distribution cabinet, centralized DC combiner box, intelligent string current collection module, aR-level fast fuse (Fuse), surge protector (SPD), MC4 interface temperature rise and DC cable arc prevention maintenance.

1. DC/AC combiner box cabinet protection and environmental anti-condensation SOP

The combiner box is installed in the outdoor environment of the photovoltaic array for a long time and is susceptible to rainwater immersion, high humidity condensation and dust poisoning.

(1) Mechanical protection and sealing inspection of the combiner box cabinet

Appearance and sealing strip inspection: Check that the shell of the combiner box (IP65 protection level) has no deformation, corrosion, leakage or cracking; check that the EPDM sealing strip of the cabinet door has not fallen off and hardened. Add anti-rust grease to maintain door locks and hinges.

Rain-proof eaves and anti-small animal nets: Check that the rain-proof eaves on the top of the cabinet are not collapsed or deformed; check that the cable threading holes at the bottom of the box are well sealed (fire-proof mud/fire-proof glue is not peeling off) to prevent small animals (such as snakes and rats) from crawling in and causing interphase short circuit accidents.

(2) Anti-condensation and insulation resistance test of the cabinet environment

Anti-condensation heater and temperature and humidity control: When the relative humidity in the cabinet is ≥ 75% RH, the anti-condensation heater must start automatically. Check that there is no water vapor condensation or green copper scale on the surface of the components in the cabinet.

Cabinet insulation resistance test: Under power outage, use a 1000V insulation megger to test the insulation resistance of the AC/DC bus to the metal shell and the ground. The insulation resistance must be ≥ 10.0 MΩ.

2. Intelligent string current collection, Voc/Isc testing and fuse (Fuse) maintenance SOP

(1) Calibration of intelligent string current acquisition module

Troubleshooting of string operating current deviation:

Use a DC clamp meter to actually measure the operating current of each string and compare it with the reading on the smart combiner box/inverter collection screen.

Standard: Under the same solar irradiance (> 600 W/m²), the operating current extreme deviation of each normal string in the same combiner box must be < 5.0%.

Current zero-point drift calibration: When the string has no current output (at night or in disconnected state), if the monitoring screen shows a small current, "Hall sensor zero-point drift calibration" must be performed in the background of the acquisition module.

(2) Actual measured SOP of string open circuit voltage (Voc) and short circuit current (Isc)

String open circuit voltage test:

Open the DC circuit breaker of the string and use a multimeter to measure the string open circuit voltage Voc. The deviation of the string open circuit voltage under the same square array must be < 2.0%.

If the measured Voc voltage is 1/3 or 1/2 less than the normal value, it means that the bypass diode of the component junction box inside the string is broken down and short-circuited, or there is a serious component crack accident.

(3) SOP for maintenance and replacement of aR-class string fast fuses (Fuse)

Fuse striker and status inspection: Check that the DC fuse base is tight; check that the red striker/status indicator on the top of the fuse has not popped out. Use a microohmmeter to test the contact resistance at both ends of the fuse. The impedance must be ≤ 0.1 mΩ.

熔断器替换 SOP:

Step 1: Open the DC main circuit breaker of the combiner box and turn off the input switch of the corresponding string to ensure that there is no load current in the circuit.

Step 2: Use a high-precision DC clamp meter to retest the string current to 0 A.

Step 3: Operation and maintenance personnel wear 1000V insulating gloves and use special insulating pullers to remove the burned fuse.

Step 4: Replace with a new original quick fuse with the same rated voltage (such as 1500V DC) and the same rated current (such as 25A ~ 32A), and fasten the base.

3. Surge Protector (SPD), MC4 interface and DC cable arc prevention SOP

(1) DC/AC surge protector (SPD) maintenance

Surge protector status window check: Check the status indication window on the SPD lightning protection module. If it displays green, it is normal; if it turns yellow or red, it means that the lightning protection module has been damaged by lightning pressure sensitivity, and the lightning protection core must be replaced immediately.

Remote signaling alarm contact test: Check the remote signaling alarm dry contact cable at the bottom of the SPD. When the lightning arrester fails during testing, the SCADA background must pop up the "Lightning Protector Failure Alarm" within < 1s.

(2) MC4 terminal and busbar connection tightening and infrared temperature measurement

Infrared thermal imaging temperature measurement: When the photovoltaic array is operating at full power (irradiance ≥ 700 W/m²), infrared temperature measurement is performed on the MC4 plug, DC circuit breaker terminals and busbar in the combiner box.

The operating temperature of the terminal block and MC4 interface must be < 60.0 ℃, and the operating temperature rise must be < 15.0 ℃. If the temperature of a terminal is > 75.0°C, the oxide layer must be polished without power and conductive paste applied.

Terminal tightening torque standards:

(3) SOP for laying DC cables along the bracket to prevent wear and arcing

There is no AC zero-crossing point on the DC side. Once the insulation of the high-voltage DC cable is damaged and the metal bracket is discharged, a continuous DC arc of several thousand degrees will be generated, which can easily cause a fire.

Laying and protection inspection: Check the laying of DC photovoltaic special cables (PV1-F / H1Z2Z2-K) along the brackets and bridges. Cables must be secured with weather-resistant and UV-resistant nylon ties with tie spacing < 1.5 meters apart.

Wear and tear inspection: Focus on checking whether the cable has sharp edges, wear and tear at the edges, corners and outlet of the metal bracket; check whether the cable joints are soaked in water troughs.

Photovoltaic power station PV side confluence and low voltage distribution system equipment level inspection and operation and maintenance sign-in form

Power station name: _______________________________ Inspection date: ____ month ____ day, 2026

Inspection area: DC/AC combiner box area Inspection person in charge: ____________________

Field equipment inspection and test data recording

2. Inspection defect registration and defect elimination dispatch

3. Inspection sign-in and review signature

Inspection Engineer (Signature): _______________ Supervision Engineer (Signature): _______________

Review (signature) of the shift leader: _______________ Sign-in and filing time: ____ hour on ____ month ____ day 2026

第4篇:光伏电站PV侧汇流与低压配电系统设备级巡检与运维

第4篇:光伏电站PV侧汇流与低压配电系统设备级巡检与运维 SOP

本篇对应光伏电站全景拓扑图【模块四:汇流与低压配电系统】,作为连接逆变器与升压箱变/组件阵列的枢纽,涵盖组串式交流汇流箱/交流配电柜、集中式直流汇流箱、智能组串电流采集模块、aR 级快速熔断器(Fuse)、浪涌保护器(SPD)、MC4 接口温升与直流电缆防拉弧检修。

一、 直流/交流汇流箱柜体防护与环境防凝露 SOP

汇流箱长期安装在光伏方阵户外野外环境,易受雨水浸泡、高湿凝露及尘毒侵蚀。

(一)汇流箱柜体机械防护与密封检查

外观与密封胶条检查:检查汇流箱(IP65 防护等级)外壳无变形腐蚀、无漏水开裂;检查柜门三元乙丙(EPDM)密封胶条无脱落硬化。加注防锈润滑脂保养门锁与铰链。

防雨檐与防小动物网:检查柜顶防雨檐无坍塌变形;检查箱体底部的电缆穿线孔封堵完好(防火泥/防火胶无剥落),防止小动物(如蛇、鼠)爬入引发相间短路事故。

(二)柜内环境防凝露与绝缘阻抗测试

防凝露加热器与温湿度控制:柜内相对湿度 ≥ 75% RH 时,防凝露加热器必须自动启动。检查柜内元器件表面无水汽结露、无青绿色铜垢。

柜体绝缘电阻测试:停电状态下,使用 1000V 绝缘摇表测试交流/直流母线对金属外壳对地绝缘电阻,绝缘阻抗须 ≥ 10.0 MΩ。

二、 智能组串电流采集、Voc/Isc 测试与熔断器(Fuse)维保 SOP

(一)智能组串电流采集模块校准

组串运行电流偏差排查:

使用直流钳形表实测各组串运行电流,与智能汇流箱/逆变器采集屏读数比对。

标准:在同一太阳辐照度(> 600 W/m²)下,同一汇流箱内各个正常组串的运行电流极值偏差须 < 5.0%。

电流零点漂移校准:当组串无电流输出(夜间或断开状态)时,若监控屏显示有微小电流,须在采集模块后台执行“霍尔传感器零点偏移校准”。

(二)组串开路电压 (Voc) 与短路电流 (Isc) 实测 SOP

组串开路电压测试:

拉开该组串的直流断路器,使用万用表测量组串开路电压 Voc,同方阵下组串开路电压偏差须 < 2.0%。

若实测 Voc 电压相比正常值缺少 1/3 或 1/2,说明该组串内部有组件接线盒旁路二极管被击穿短路,或存在严重的组件隐裂事故。

(三)aR 级组串快速熔断器(Fuse)维保与替换 SOP

熔断器撞针与状态检视:检查直流熔断器底座紧固;检查熔断器顶部的红色撞针/状态指示器无弹出。使用微欧计测试熔断器两端接触电阻,阻抗须 ≤ 0.1 mΩ。

熔断器替换 SOP:

第1步:拉开汇流箱直流总断路器,并断开对应组串的输入开关,确保电路无负载电流。

第2步:使用高精度直流钳形表复测组串电流为 0 A。

第3步:运维人员佩戴 1000V 绝缘手套,使用专用绝缘拔子将烧毁的熔断器取下。

第4步:换上同额定电压(如 1500V DC)及同额定电流(如 25A ~ 32A)的新原厂快速熔断器,扣紧底座。

三、 浪涌保护器(SPD)、MC4 接口与直流电缆防拉弧 SOP

(一)直流/交流浪涌保护器(SPD)维保

防雷器状态视窗检查:检查 SPD 防雷模块上的状态指示窗口。显示绿色为正常;若变为黄色或红色,说明防雷模块已被雷击压敏击穿,必须立即更换防雷芯。

遥信报警触点测试:检查 SPD 底部的遥信报警干接点线缆,测试防雷器失效时 SCADA 后台须在 < 1s 内弹出“防雷器失效告警”。

(二)MC4 端子与母排连接紧固及红外测温

红外热成像测温:在光伏方阵满功率运行(辐照度 ≥ 700 W/m²)状态下,对汇流箱内 MC4 插头、直流断路器端子及汇流母排进行红外测温。

接线端子及 MC4 接口运行温度须 < 60.0 ℃,运行温升须 < 15.0 ℃。若某接线端子温度 > 75.0 ℃,须停电打磨氧化层并涂抹导电膏。

端子紧固力矩标准:

(三)直流电缆沿支架敷设防磨损拉弧 SOP

直流侧无交流过零点,高压直流电缆一旦绝缘破损对金属支架放电,会产生高达数千度的持续直流电弧,极易引发大火。

敷设与防护排查:检查直流光伏专用电缆(PV1-F / H1Z2Z2-K)沿支架及桥架敷设情况。电缆须使用耐候抗紫外线尼龙扎带固定,扎带间距 < 1.5 米。

磨损排查:重点排查电缆在金属支架边缘、转角及出线口处是否有锋利边缘磨损破皮;排查电缆接头无浸泡在积水槽中。

光伏电站PV侧汇流与低压配电系统设备级巡检与运维签到表

电站名称:_______________________________ 巡检日期:2026 年 ____ 月 ____ 日

巡检区域:直流/交流汇流箱区域 巡检负责人:____________________

现场设备巡检与测试实测数据记录

二、 巡检缺陷登记与消缺派工

三、 巡检签到与复核签字

巡检工程师 (签字):_______________ 监护工程师 (签字):_______________

值班长复核 (签字):_______________ 签到归档时间:2026 年 ____ 月 ____ 日 ____ 时