第三章

Chapter 3: Corrective Maintenance SOP (Corrective Maintenance SOP)

This chapter stipulates the physical disassembly and repair standards when P1/P2 level hardware failure occurs in the energy storage system. All operations must be performed by a CoreTect certified engineer holding a low voltage/high voltage electrician's license. Before performing any disassembly actions, engineers must have system-level topological troubleshooting thinking.

3.1 Hybrid inverter topology and fault determination foundation (System Topology & Triage Foundation)

CoreTect engineers strictly prohibit blind replacement of accessories without identifying the root cause (Root Cause). It is necessary to be familiar with the "five core circuit modules" inside the inverter and their energy flow, which will serve as the fundamental basis for determining liability for on-site faults and disclaiming legal liability.

3.1.1 Core anatomy of the inverter (Hardware Topology)

(Note: Engineers need to memorize this diagram, and on-site troubleshooting must strictly follow this energy flow direction)

3.1.2 Function definition and fatal fault mapping of each module

1. MPPT photovoltaic boost circuit: responsible for extracting solar energy.

High frequency fault: PV insulation resistance too low (Error 201 / F24).

Criteria for determining liability: Most cases are caused by broken roof cables and leakage during rainy seasons. If the alarm disappears after unplugging the PV cable, it is judged that the inverter is intact and it is the responsibility of external engineering construction.

2. Bidirectional battery charging and discharging circuit (Buck-Boost): responsible for the step-up and step-down conversion between the battery and the high-voltage bus.

High frequency fault: Passive alarm / unable to charge and discharge.

Criteria for determining liability: Check the underlying communication status of the BMS. If the cell voltage difference is too large and causes the BMS to lock up, it will be judged as improper battery maintenance and a cell reconstruction work order will be entered.

3. DC high-voltage bus (DC Bus): the energy accumulation reservoir of the whole machine (high-voltage danger zone).

High frequency fault: Bus soft start failed (Fault 09).

Liability determination standard: If a busbar failure is reported when the machine is turned on, accompanied by a burning smell, it will be judged as a serious internal short circuit and the machine will be shut down immediately.

4. Inverter bridge circuit (DC-AC Inverter): converts DC into household AC sine wave. The most vulnerable core of the entire machine.

High frequency fault: AC/DC hardware overcurrent (F18), IGBT short circuit.

Criteria for determining liability: Use a multimeter to measure the output end of the diode. If the resistance is zero, the IGBT has broken down. 90% of the cases are caused by the high-power inductive load (deep well water pump/old compressor) generated by the customer's private connection, which is an illegal use and the original manufacturer refuses to insure it.

5. AC output and grid-connected control circuit: manages and controls grid entry and exit and off-grid switching.

High-frequency faults: relay fault (Error 117), grid undervoltage/overvoltage protection.

Liability determination standard: If the grid voltage exceeds the limit, enter the menu to relax the wide voltage range; if the power outage cannot be switched, it is likely that the relay contacts are sintered, and board-level replacement needs to be performed.

3.1.3 Golden Rule of Troubleshooting

External first, then internal; communication first, then strong electricity.

For any fault that causes motherboard breakdown (IGBT explosion), engineers are absolutely prohibited from using a soldering iron for chip-level repairs on site. A "Hardware Damage RCA Report" must be issued and the customer is required to pay for a board-level swap to avoid joint legal liability for fires caused by secondary explosions.

3.2 BMS motherboard burnt/locked replacement procedure (BMS Replacement)

Applicable scenarios: Cloud monitoring shows BMS offline, MOS tube breakdown and short circuit, or serious faults that cannot be resolved through remote commands.

Fatal safety warning: The BMS connects the high-voltage cell cluster to the inverter grid. Once the order of disassembly and assembly of the wiring harness is reversed, it will cause an instant short circuit of the collection line, secondary burnout of the motherboard, and even cause arc burns!

3.2.1 Disassembly preparation and safe isolation

System complete power outage (LOTO): follow the standards in Section 2.2, disconnect the AC and DC main gate, and hang the safety lock. Use a multimeter to confirm bus voltage < 36V DC.

Physical isolation: Use high-voltage insulating tape to wrap all exposed external cable terminals (connected to the inverter end) to prevent them from touching the metal shell of the cabinet.

3.2.2 Strict Disassembly Sequence

The first step (disconnect weak current): First unplug all "cell voltage/temperature sampling cables (white multi-core cables)" on the BMS! Never remove the main power cord while the sampling line is plugged in, otherwise the floating voltage will breakdown the motherboard chip.

Step 2 (disconnect communication): Unplug the RS485/CAN communication network cable connecting the 4G DTU gateway and the inverter, as well as the screen cable.

Step 3 (Disconnect the main negative output): Use an insulated socket wrench to remove the black main negative wire connected to the BMS P- (or C-/load terminal).

Step 4 (Disconnect the negative input of the battery): Finally, remove the total negative input line connected to B- (battery terminal) of the BMS.

3.2.3 Strict installation sequence (Installation Sequence)

(Principle: completely opposite to the disassembly sequence)

Step one (connecting the battery terminal): Firmly connect the battery negative copper bar to the B- terminal of the new BMS. Mark the standard torque of 12 N·m and draw the red and blue anti-loosening lines.

Step 2 (connecting the output terminal): Connect the negative pole of the external output to the P- terminal of the BMS.

The third step (weak current verification and access - key!): Before plugging in the sampling cable, you must use the black test lead of the multimeter to ground, and the red test lead to measure each pin of the cable plug in sequence. Confirm that the voltage increases step by step from 3.2V, 6.4V, and 9.6V. After confirming that there is no disconnection or disorder, firmly insert the sampling cable into the new BMS mainboard and hear a "click" sound to confirm that it is locked.

Step 4 (Restore communication): Plug back the 4G DTU network cable and temperature measurement NTC probe.

3.2.4 Software burning and closed loop

Turn on the DC circuit breaker and power on the system.

Connect the laptop via USB to RS485 cable and open the BMS host computer software. Load the factory configuration file (Profile): Import CoreTect's exclusive parameter package for this model of battery (overvoltage 3.65V, undervoltage 2.70V, maximum charging current, etc.). Confirm that the equipment is back online in the Coretect cloud backend, complete the trial run for 15 minutes, and submit the replacement SN code for entry into the spare parts library.

3.3 "Cell Top-Balancing & Replacement" procedures for serious voltage differences in single cells (Cell Top-Balancing & Replacement)

Applicable scenarios: Cloud alarm cell voltage difference (Delta-V) > 100mV, or the internal resistance of a certain string of cells becomes abnormally large, resulting in a sudden drop in the package capacity.

3.3.1 Diagnosis and physical extraction

Cloud positioning: Before emergency repair, use the CoreTect Cloud historical curve to accurately locate the backward cell number (such as Cell #14).

Safe removal: Use an insulated ratchet wrench to remove the battery pack top cover. Since the 314Ah battery cell is extremely heavy (about 5.5kg), you must use a professional suction cup or handle to pull it out vertically. It is strictly prohibited to hold the pole to lift the battery cell!

3.3.2 Cell depth charge and discharge (Top-Balancing)

(If the battery core is not physically damaged, it is just severe starvation and imbalance)

Equipment preparation: Place the Coretect-2050 battery capacity tester on an anti-static workbench.

Parameter setting (no errors allowed): Set the tester mode to "Constant current and constant voltage charging (CC-CV)". The voltage cutoff upper limit is strictly set to 3.60V (the absolute safety upper limit of lithium iron phosphate). Current setting is 20A - 50A depending on the situation.

Execution operation: Use the Kelvin test clip to clamp the positive and negative poles of the outdated battery cell, start recharging until the charging current drops below 0.5A, and determine that the battery cell is fully charged.

3.3.3 Battery core replacement and torque control

(If the internal resistance tester shows that the internal resistance of the battery cell is > 0.5mΩ, it is determined that the internal physical damage is caused and must be replaced with a new one)

Get new batteries of the same batch and internal resistance (with M6 studs pre-welded) from the spare parts warehouse.

In-line assembly: Put the new battery core into the module, and a 1mm-thick FR4 epoxy resin insulation board must be inserted in the middle to prevent the expansion and friction of the battery core from causing short circuit.

Connect the copper bar: Put on the flexible connecting copper bar and flange anti-slip nut.

Torque Control (Core Red Line): Use an insulated torque wrench, set strictly to 6 N·m (for M6 studs). Excessive torque will twist off the internal tabs of the battery core and cause a fire; too small torque will cause excessive contact resistance and heat generation. After tightening, use a red marker to draw a "single line" across the nut and copper bar.

第三章

第 3 章:核心部件更换与现场抢修标准操作规程 (Corrective Maintenance SOP)

本章规定了储能系统发生 P1/P2 级硬件故障时的物理拆解与抢修标准。所有操作必须由持有低压/高压电工证的 CoreTect 认证工程师执行。在执行任何拆卸动作前,工程师必须具备系统级的拓扑排障思维。

3.1 混合逆变器拓扑架构与故障定责基础 (System Topology & Triage Foundation)

CoreTect 工程师严禁在未查明根因(Root Cause)的情况下盲目更换配件。必须熟知逆变器内部的“五大核心电路模块”及其能量流向,以此作为现场故障定责与法务免责的根本依据。

3.1.1 逆变器核心五脏解剖图 (Hardware Topology)

(注:工程师需将此图熟记于心,现场排障必须严格遵循此能量流向)

3.1.2 各模块功能定义与致命故障映射

1. MPPT 光伏升压电路:负责榨取太阳能。

高频故障:PV 绝缘阻抗过低 (Error 201 / F24)。

定责标准:多为雨季屋顶线缆破皮漏电。拔除 PV 线若报警消失,判定逆变器完好,属外部工程施工责任。

2. 双向电池充放电电路 (Buck-Boost):负责电池与高压母线间的升降压转换。

高频故障:无源报警 / 无法充放电。

定责标准:查验 BMS 底层通讯状态。若电芯压差过大导致 BMS 锁死,判定为电池维护不当,转入电芯重构工单。

3. 直流高压母线 (DC Bus):全机能量汇聚水库(高压危险区)。

高频故障:母线软启动失败 (Fault 09)。

定责标准:若开机即报母线故障,且伴有焦味,判定为内部严重短路,立即封机。

4. 逆变桥电路 (DC-AC Inverter):将直流转换为家用交流正弦波。全机最脆弱的核心。

高频故障:交/直流硬件过流 (F18)、IGBT 炸机短路。

定责标准:万用表二极管档测输出端,若阻值为零则 IGBT 击穿。90% 系客户私接大功率感性负载(深井水泵/老旧压缩机)产生反冲高压所致,属违规使用,原厂拒保。

5. 交流输出与并网控制电路:管控电网进出与离网切换。

高频故障:继电器故障 (Error 117)、电网欠压/过压保护。

定责标准:若电网电压超限,进菜单放宽宽压范围;若停电无法切换,多为继电器触点烧结,需执行板级更换。

3.1.3 现场排障铁律 (Golden Rule of Troubleshooting)

先外部,后内部;先通讯,后强电。

任何导致主板击穿(IGBT炸裂)的故障,工程师在现场绝对禁止使用电烙铁进行芯片级维修。必须出具《硬件损毁 RCA 报告》,要求客户付费进行整板替换(Board-level Swap),以规避二次炸机引发的火灾连带法律责任。

3.2 BMS 主板烧毁/锁死更换规程 (BMS Replacement)

适用场景:云端监控显示 BMS 离线、MOS 管击穿短路、或无法通过远程指令解除的严重故障。

致命安全警告:BMS 连接着高压电芯簇与逆变器电网。拆装线束的顺序一旦颠倒,将导致采集线瞬间短路、主板二次烧毁,甚至引发人员电弧灼伤!

3.2.1 拆卸准备与安全隔离

系统彻底断电 (LOTO):遵循 2.2 节标准,断开交直流总闸,悬挂安全锁。使用万用表确认母线电压 < 36V DC。

物理隔离:用高压绝缘胶带将所有裸露的外部电缆端子(接逆变器端)包扎死,防止触碰机柜金属外壳。

3.2.2 严格拆卸顺序 (Disassembly Sequence)

第一步(断开弱电):首先拔掉 BMS 上所有的“电芯电压/温度采样排线(白色的多芯排线)”! 绝对不能在采样线插着的情况下拆主电源线,否则悬浮电压会击穿主板芯片。

第二步(断开通讯):拔掉连接 4G DTU 网关和逆变器的 RS485/CAN 通讯网线,以及屏幕排线。

第三步(断开主负极输出):使用绝缘套筒扳手,拆除接在 BMS P-(或 C- / 负载端)上的黑色总负极线。

第四步(断开电池负极输入):最后拆除接在 BMS B-(电池端)上的总负极输入线。

3.2.3 严格安装顺序 (Installation Sequence)

(原则:与拆卸顺序完全相反)

第一步(接电池端):将电池总负极铜排牢固连接至新 BMS 的 B- 端子。打上 12 N·m 的标准扭矩,并画上红蓝防松线。

第二步(接输出端):连接外部输出负极至 BMS 的 P- 端子。

第三步(弱电核验与接入 - 关键!):在插上采样排线前,必须用万用表黑表笔接地,红表笔依次测量排线插头的每一个针脚。确认电压呈 3.2V、6.4V、9.6V 阶梯状递增。确认无断线、无序乱后,将采样排线用力插入新 BMS 主板,听见“咔哒”声确认锁死。

第四步(恢复通讯):插回 4G DTU 网线与测温 NTC 探头。

3.2.4 软件烧录与闭环

开启直流空开,给系统上电。

通过 USB 转 RS485 线连接笔记本电脑,打开 BMS 上位机软件。载入出厂配置文件 (Profile):导入 CoreTect 针对该型号电池的专属参数包(过压 3.65V、欠压 2.70V、最大充电电流等)。在 Coretect 云端后台确认设备重新上线,完成试运行 15 分钟,提交换件 SN 码录入备件库。

3.3 单体电芯严重压差“深度均衡与更换”规程 (Cell Top-Balancing & Replacement)

适用场景:云端报警单体压差 (Delta-V) > 100mV,或某串电芯内阻异常变大,导致整包容量骤降。

3.3.1 诊断与物理提取

云端定位:在抢修前,通过 CoreTect Cloud 历史曲线,精准定位落后电芯编号(如:Cell #14)。

安全拆卸:使用绝缘棘轮扳手拆除电池包顶盖。由于 314Ah 电芯单体极重(约 5.5kg),必须使用专业吸盘或提手垂直向上拔出,严禁抓着极柱提拉电芯!

3.3.2 单体深度充放电 (Top-Balancing)

(若电芯未物理损坏,仅为严重饿死失衡)

设备准备:将 Coretect-2050 电池容量测试仪放置在防静电工作台上。

参数设定(严禁出错):将测试仪模式设为“恒流恒压充电 (CC-CV)”.电压截止上限严格设定为 3.60V(磷酸铁锂绝对安全上限)。电流设定为 20A - 50A 视情况而定。

执行操作:使用开尔文测试夹夹住落后电芯正负极,启动补电,直至充电电流降至 0.5A 以下,判定该电芯满电。

3.3.3 电芯更换与扭矩管控

(若内阻测试仪显示该电芯内阻 > 0.5mΩ,判定内部物理损坏,必须换新)

从备件库领取同批次、同内阻的新电芯(已预焊 M6 螺柱)。

入列装配:将新电芯放入模块,中间必须插入 1mm 厚度的 FR4 环氧树脂绝缘板,防止电芯膨胀摩擦导致短路。

连接紫铜排:套上柔性连接铜排和法兰防滑螺母。

扭矩管控(核心红线):使用绝缘扭矩扳手,严格设定为 6 N·m(针对 M6 螺柱)。扭矩过大将拧断电芯内部极耳引发起火;扭矩过小会导致接触电阻过大发热。 紧固后使用红色记号笔画出一条横跨螺母和铜排的“一字防松线”