Standard operating procedures for daily inspection of industrial and commercial rooftop photovoltaic power stations

Standard Operating Procedure (SOP) for Routine Inspection of Industrial and Commercial Rooftop Photovoltaic Power Stations

Applicable scenarios: Daily inspection and inspection of rooftop electrical equipment and ancillary facilities

Inspection tools: infrared thermometer gun, clamp ammeter, smartphone/inspection terminal (equipped with smart photovoltaic digital operation platform App), safety helmet, reflective vest, etc.

1. 光伏组件巡检 (PV Module Inspection)

1.1 Appearance inspection

Check the cleanliness of the surface of the photovoltaic modules and confirm whether there are serious dust accumulations, bird droppings, fallen leaves, weeds and other obstructions.

1.2 Operating temperature detection

Tools: Infrared thermometer gun

Test conditions: Solar irradiance is not less than 500W/m², wind speed is not more than 2m/s.

Judgment criteria: Use a temperature measuring gun to measure the temperature at multiple points on the outer surface of the same photovoltaic module to confirm that the surface temperature difference is not greater than 20°C (to prevent the hot spot effect).

1.3 Mechanical structure inspection

Check the component pressure block, shake it by hand or visually confirm whether each connection point is firm and whether it is loose.

2. 逆变器巡检 (Inverter Inspection)

2.1 Appearance and operating status inspection

Check the appearance of the entire inverter to ensure that the equipment is clean and free of serious dust accumulation.

Get close to the device and confirm through your senses: there is no smell of burning electrical appliances, no abnormal operating noise, and the cooling fan is operating normally.

2.2 Temperature and electrical connection detection

Tools: Infrared thermometer gun

Detect the operating temperature of the inverter.

Focus on detecting the temperature of the cable interface on the DC side and AC side of the inverter to confirm that there is no abnormal heating.

Visually inspect the cable insulation layer to confirm that there are no signs of aging, heating, or discharge (arcing).

2.3 电流检测

工具:钳形电流表

Test each DC branch of the inverter one by one to observe and check whether the current value is within the normal range.

2.4 Recording and Restoration

Take photos to obtain evidence of the equipment's operating status and detection values, and upload them to the "Smart Photovoltaic Digital Operation Platform" to preserve the traces.

After the inspection is completed, be sure to close and lock the inverter cabinet door.

2.5 Bracket system inspection

Check all fasteners and connections of the inverter mounting bracket to make sure they are not loose or falling off.

Observe the anti-corrosion coating on the surface of the bracket to confirm whether there is cracking or large-scale peeling off.

3. Fire Safety Equipment Inspection

3.1 Fire extinguisher body inspection

Check the fire extinguisher barrel to confirm there is no obvious corrosion, deformation or physical damage.

Check the expiration date of the fire extinguisher to make sure it has not expired.

Observe the pressure gauge pointer to confirm whether the pressure is within the normal range (green zone).

3.2 Safety accessories inspection

Check the lead seal and safety pin of the fire extinguisher to make sure they are intact and have not been pulled out or damaged.

3.3 记录更新

On the paper inspection card attached to the fire extinguisher, fill in the inspection record, date and signature.

Take photos to record the inspection results and upload them to the digital operation platform.

4. Cable Tray & Grounding Inspection

4.1 Visual inspection of the bridge

Patrol along the direction of the bridge to check whether there is serious corrosion or structural damage on the surface of the metal bridge.

Test the bridge cover with your hands to confirm that it is firmly fixed and has not been blown open or displaced by strong winds.

4.2 Grounding system inspection

Check the ground jumpers between metal cable trays to confirm whether the connection terminals are reliably connected and not loose.

Check the bolt nodes of all grounded flat irons on the roof array to confirm whether they are tightened one by one.

5. Reporting of inspection results (Reporting & Conclusion)

5.1 数据录入

Open the "Smart Photovoltaic Digital Operation Platform" App, fill in the results of all inspection items, and form a complete electronic inspection record.

5.2 Summary and closed loop

Analyze and summarize data anomalies or hidden dangers discovered during inspections in the system.

Finally, a standardized "inspection report" is generated through the platform with one click and submitted to the power station owner.

工商业屋顶光伏电站日常巡检标准作业程序

工商业屋顶光伏电站日常巡检标准作业程序(SOP)

适用场景:屋顶电气设备及附属设施的日常巡视与检查

巡检工具:红外测温枪、钳形电流表、智能手机/巡检终端(搭载智慧光伏数字运营平台App)、安全帽、反光背心等。

1. 光伏组件巡检 (PV Module Inspection)

1.1 表观检查

检查光伏组件表面清洁情况,确认是否存在严重的灰尘堆积、鸟粪、落叶杂草等遮挡物。

1.2 运行温度检测

工具:红外测温枪

测试条件:太阳辐照度不小于 500W/m²,风速不大于 2m/s。

判定标准:使用测温枪对同一光伏组件外表面进行多点测温,确认表面温度差异不大于 20℃(防止热斑效应)。

1.3 机械结构检查

检查组件压块,用手晃动或目视确认各连接点是否牢固,有无松动。

2. 逆变器巡检 (Inverter Inspection)

2.1 外观与运行状态检查

检查逆变器整机外观,确保设备干净、无严重积灰。

靠近设备,通过感官确认:无电气烧焦异味、无异常运行噪声、散热风扇运行正常。

2.2 温度与电气连接检测

工具:红外测温枪

检测逆变器整机的运行温度。

重点检测逆变器直流侧和交流侧的电缆接口温度,确认无异常发热。

目视检查线缆绝缘层,确认无老化、发热或放电(拉弧)迹象。

2.3 电流检测

工具:钳形电流表

对逆变器各个直流支路进行逐一检测,观察并核对电流数值是否在正常范围内。

2.4 记录与复原

对设备运行状态、检测数值进行拍照取证,并上传至“智慧光伏数字运营平台”保存留痕。

检测完毕后,务必关闭并锁紧逆变器柜门。

2.5 支架系统检查

检查逆变器安装支架的所有紧固件、连接件,确认无松动脱落。

观察支架表面的防腐涂层,确认是否存在开裂或大面积脱落现象。

3. 消防设施巡检 (Fire Safety Equipment Inspection)

3.1 灭火器本体检查

检查灭火器筒体,确认无明显的锈蚀、变形或物理损伤。

检查灭火器有效期限,确认未超期。

观察压力表指针,确认压力是否在正常范围(绿区)。

3.2 安全配件检查

检查灭火器的铅封、保险销,确认其完好无损、未被拔出或破坏。

3.3 记录更新

在灭火器附带的纸质点检卡上,填写本次检查记录、日期并签名。

拍照记录点检结果,并上传至数字化运营平台。

4. 桥架及接地系统巡检 (Cable Tray & Grounding Inspection)

4.1 桥架外观检查

沿着桥架走向巡视,检查金属桥架表面是否有严重锈蚀或结构损坏。

用手试探桥架盖板,确认其固定牢固,未被大风吹开或移位。

4.2 接地系统检查

检查金属电缆桥架之间的接地跨接线,确认连接端子是否可靠连接,无松脱。

检查屋顶阵列所有接地扁铁的螺栓节点,逐一确认是否紧固。

5. 巡检结果上报 (Reporting & Conclusion)

5.1 数据录入

打开“智慧光伏数字运营平台”App,填报所有巡检项的结果,形成完整的电子巡检记录。

5.2 总结与闭环

针对巡检中发现的数据异常或隐患,在系统中进行分析和总结。

最终通过平台一键生成标准化《巡检报告》,并提交给电站业主方。